  • - Replace of Cold Water Storage Tanks
  • - Service and Maintenance Contract

PES had been requested to carry out a full Legionella Risk Assessment and Chlorination of stored cold water.

Upon inspection of the cold water galvanised tanks it was clear that replacement tanks to new GRP sectional were required.

PES planned and carried out the decommissioning, controlled cutting and removal from site of the steel tanks, together with craneage of new GRP tanks into position along with all pipework reconnections and testing in time for the School to start a new term, with clean safe water.

Thus proving to the school Facilities Team our controlled planning and good work ethics enabled PES to tender and secure the Contract for the full mechanical and electrical maintenance throughout the School.